The George Washington University instituted Facilities Information Management (FIM) standards in August 2014, issuing a FIM Procedures Manual to outline workflows, professional responsibilities, required project deliverables, and more, for all new construction and renovation projects. The development of the FIM Procedures manual was the latest step in the evolution of project delivery at the George Washington University – an evolution I discussed at the Center for Integrated Facility Engineering (CIFE) Summer Program at Stanford University with my presentation “Process, Progress, and Promise at The George Washington University” in June 2014.
The progression and implementation of FIM at GW has advanced by leaps and bounds since mid-2013, but the momentum has been building since 2009. In my presentation, I laid out the following timeline:
2009 – Paper archive; 2D CAD-based space plans
2010 – Began digitization of archive
2011-2012 – Leveraged 2D CAD based space plans
2013 – Drawing archive digitized; began developing BIM standards
2014 – Developed BIM execution plan; redefined facilities management requirements
When I first arrived at GW, the archive of project documentation – drawings, submittals, operations & maintenance (O&M) manuals, etc. – was almost exclusively paper. We had flat files and archive boxes full of paper, stored in a basement archive room. We would also receive 2D CAD files (typically in AutoCAD DWG file format) for some of our projects, which we used to build an inventory of space plans for some larger buildings. We continue to build our space plan inventory through record drawings of new construction projects, updated renovation drawings, and surveys of existing building conditions.
In 2010, the process of scanning the paper archive began – a process which took two and a half years to reach substantial completion. Archived drawings were scanned to PDF and uploaded to an online repository in AiM, our Computer Aided Facilities Management system (CAFM). Building drawings, facility condition assessments, and some other reports – some files dated as far back as the 1910s – were tagged with metadata making files searchable by building, project year, and drawing discipline (i.e. – architectural, structural, civil, and so on). Once created, this online repository was shared with GW stakeholders and vendors doing construction and renovation work with GW, thereby making our most accurate archived building data immediately accessible to those who required it.
After the digitization of our paper archive, and the efforts to build a more robust inventory of 2D CAD files (which were also added to the AiM repository), the next step in the evolution of process workflows and more fluid sharing of archived information was to analyze how building information modeling (BIM) could be leveraged in a manner that made sense to the Division of Operations at the George Washington University. As part of this analysis, we examined our internal processes, RFP and contract language, and required deliverables, as well as how we utilize the information and documentation we receive.
As a result of this collaborative analysis, GW changed its RFP and contract language, and also developed the FIM Procedures Manual, a BIM Project Execution Plan, an asset information exchange table, and new requirements for paperless project delivery, including:
- Record building information models
- O&M manuals
- Approved submittals
- Building asset data
- Construction documents
What we hope to achieve by adopting these new FIM procedures is:
- Reduced time closing out projects and commissioning data
- Reduced project costs for work and rework
- More reliable building information, both for lifecycle maintenance and for renovation projects
- Consistent data delivered from project to project
- Building and asset data immediately available in AiM at turnover
We are beginning to receive deliverables from newer projects under the FIM Procedures Manual, and we’re already seeing an immediate savings in time and effort for processing data received at project closeout, thereby enabling more efficient, effective, and comprehensive lifecycle maintenance of buildings. I will continue to keep you abreast of successes, lessons learned, and potential process improvements as we further implement FIM at the George Washington University.
-JLF